Tuesday, 31 March 2015
Contract sign
Contract sign
18th December 2014
Today we had our contract sign. We were excited to say the least ;)
It took awhile as when we had received our contracts from tender we had noticed that Carlisle Homes had changed our floor plan somewhat! We noticed that the kids toilet was turned around facing front ways instead of the side which it originally was on the plans, as well as the kids main bathroom shower was cut in half which was very strange as we knew this as a double shower not a single!!
We also had noticed they had taken off our doors to our "theatre" and then made it smaller and removed our doors all together and has renamed it the "study". Therefore we needed to have a lengthy chat to our CLE regarding these issues we had discovered at home whilst going through the contract at our contract sign appointment.
Jason and I therefore were waiting a fair while in the carlsile homes consulting room for our CLE to go upstairs and speak to their drafts man. We ended up having about an 5 hour appointment in total from this instead of a 2 hour lol
Anyhoo, CLE came back eventually lol and she had told us that they wernt able to tell us that day how our floor plan would be, we signed everything else besides the floor plan left that in the hands of Carlisle Homes and went on our Mary way ...they had told us we would most likely hear back from them after xmas now as it was so close to xmas and their drafts man would attend to it after xmas break up!!
Have to admit was slightly frustrating not being able to just sign off our contract in full that day and it just be done!! Asfterall they were the ones that decided to change the exsisting floor plan on us just to "accomodate" the butlers pantry, we had originally been told that they just took bit out of the 2nd and 3rd bedroom laundry, and theatre and that was it.
So now we wait till after xmas ............